PROJECT CASE STUDY
McDonalds Case Study - 140 remodel locations in Northern California were successfully completed in 2007. Speedy, accurate and cost effective.. read on...
PROJECT CASE STUDY
Wall-Mart Case Study - In 2004 Sacramento Engineering Consultants was approached by Wal-Mart to engineer fire protection plans for a California Store.. read on...
|
|
|
WELCOME
High construction and energy costs necessitate practically designed HVAC and lighting systems utilizing the most energy efficient equipment. Sacramento Engineering Consultants addresses these needs by providing practical engineering expertise to the construction industry at a reasonable cost.
|
| |
MAIN SERVICES
|
| |
We have engineered HVAC systems from high rise office buildings to single air conditionings unit tenant improvement read on..
|
The most detailed and intense plumbing requirements are on medical / dental, restaurants and multi-family read on..
|
SEC started as an electrical engineering firm in 1989. Having worked as an electrical contractor and Corps of Engineering read on..
|
Fire sprinkler design has traditionally been a design/build portions of projects. However, building departments are requiring read on...
|
| |
|
| |
We have functioned as LEED AP on State of California, Sacramento City, City of Elk Grove and private industry LEED projects read on..
|
We have engineered dozens of solar panel installation projects totaling tens of thousands of kilowatts of power read on..
|
Coordination with utility companies, power, telephone, cable TV, and gas for creation of unified site plan
read on..
|
Fire sprinkler design, site fire sprinkler engineering is being more important to overall building design read on...
|
|