PROJECT CASE STUDY
McDonalds Case Study - 140 remodel locations in Northern California
were successfully completed in 2007. Speedy, accurate and
cost effective.. read on...
PROJECT CASE STUDY
Wall-Mart Case Study - In 2004 Sacramento Engineering Consultants was approached by Wal-Mart to engineer fire protection plans for a California Store..
read on...
|
|
|
WELCOME
High construction and
energy costs necessitate practically designed HVAC and
lighting systems utilizing the most energy efficient
equipment. Sacramento Engineering Consultants addresses
these needs by providing practical engineering expertise
to the construction industry at a reasonable cost. |
|
MAIN SERVICES |
| |
We have engineered HVAC systems from high rise
office buildings to single air conditionings
unit tenant improvement
read on..
|
The most detailed and intense plumbing
requirements are on medical / dental,
restaurants and multi-family
read on..
|
SEC started as an electrical engineering
firm in 1989. Having worked as an electrical
contractor and Corps of Engineering
read on..
|
Fire sprinkler design has traditionally been a
design/build portions of projects. However,
building departments are requiring
read
on...
|
| |
|
|
We have functioned as LEED AP on State of
California, Sacramento City, City of Elk Grove and
private industry LEED projects read on..
|
We have engineered dozens of solar panel
installation projects totaling tens of thousands of
kilowatts of power read
on..
|
Coordination with utility companies, power,
telephone, cable TV, and gas for creation of unified
site plan
read on..
|
Fire sprinkler design, site fire sprinkler engineering is being more important to overall building design read
on...
|
|